NDA sigend and usage data collected.
An initial analysis to be presented and accepted by the client.
Once eligibility is confirmed, we provide the client with a tailored project outline and next steps.
Corporation Agreesment signed.
The professional engineering team conducts a feasibility study under the 100% funding from BC hydro.
Pre-design and equipment solution confirmed.W
e ensure the project meets BC Hydro's eligibility criteria.
A dedicated project manager works with the client to guide them through the application, installation, and commissioning process.
Discover sustainable solutions that reduce costs and environmental impact. Take the first step today!